SITE DATA
Location Description:
312 W. Olive St
North:
W Oak St
South:
W Olive St
East:
S Meldrum St
West:
S Howes St
Zoning 1:
D--Downtown District
GENERAL
RCIM:
Residential
Combined Submittal:
No
Subdivision Plat:
Without Plat
Current Round:
2
DATES
Conceptual Review:
02/12/2016
Conceptual Review Meeting:
Yes
Neighborhood Meeting:
Yes
Neighborhood Meeting Date:
02/22/2016
Project Submittal Date:
03/16/2018
Project Expiration Date:
04/15/2019
Hearing Date:
05/31/2018
Hearing Type:
Type 2
Decision:
Approved w/Conditions
Decision Date:
05/31/2018
Conditions of Approval:
1. Provide an identifiable entrance with a door into the building; if from a design standpoint that is not feasible, then the LPC would accept an identifiable entry into the site (to comply with 3.4.7) (F)(2)).
2. Horizontal elements such as the roofline facia should align across the building (to comply with 3.4.7) (F)(2)).
3. The rose garden should be relocated to a location where it will get adequate exposure to the sun so that the roses thrive; and the location should be in a place where it is a prominent feature of the site (to comply with 3.4.7) (F)(5)).
4. The current conditions and location of the historic rose garden will be documented before relocation (to comply with 3.4.7) (F)(5)).
5. The additional condition related to LPC Condition #3 recommended by staff: the Low Impact Development (LID) design for the site can be completed at Final Design with the stipulation that the site provide treatment of 50% of the proposed impervious area with an approved and appropriately sized LID method that does not impair the location or function of the historic rose garden. This will include removal of the proposed rain garden facility (South of the stair tower) to allow for an expanded heritage planting area (see Oasis on Olive LPC EXHIBIT 1).
6. That no fence shall be installed along the East property line between 231 S. Howes and 310 W. Olive and such conditions shall be included in a legally binding covenant with respect to both properties.
Development Agreement Signed Date:
11/14/2018
PDP Approval Date:
05/31/2018